RESPONSIBLE AGENCY DROTe (Direção Regional de Ordenamento do Território)
RESPONSIBLE FOR METADATA DROTe (Direção Regional de Ordenamento do Território)
CURRENT STATION CONFIGURATION stnb00prt_20240105.log
STATUS IN EPN included since 06-11-2022
LAST AVAILABLE DATA 22-04-2024
LAST RECEIVER SEPT POLARX5 (28-01-2022 to now)
SET TO TRACK GPS+GLO+GAL+BDS+QZSS+SBAS
LAST ANTENNA LEIAR10/NONE (13-12-2023 to now)
INDIVIDUAL CALIBRATION(S) none
DATA ROUTINELY ANALYSED BY ASI, BEK, IGE
INCLUSION IN OTHER NETWORK(S) EPOS

The RINEX 2 data are no more submitted to the EPN data centres since 26-01-2022.

RINEX V2.11
Daily
(data calendar)

No recent data available

RINEX V3.04 - GPS+GLO+GAL+BDS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 107/2024 71.43%
BEV 113/2024 92.86%
BKGE 113/2024 92.86%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 114/2024 (S) 99.4% 92.86%
BKGE 114/2024 (S) 100% 100%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Location

Pictures